Advertising

The Seattle Times Company

NWjobs | NWautos | NWhomes | NWsource | Free Classifieds | seattletimes.com

The Seattle Times

Local News


Our network sites seattletimes.com | Advanced

Originally published October 24, 2009 at 3:32 PM | Page modified October 25, 2009 at 12:29 AM

Comments (29)     E-mail E-mail article      Print Print view      Share Share

Wash. will put seismic sensors on viaduct

The state plans to equip the crumbling Alaskan Way Viaduct with sensors that will close the elevated roadway at the first sign of seismic activity, Gov. Chris Gregoire said Saturday.

The Associated Press

Viaduct closed for inspection

Both decks of the Alaskan Way Viaduct are closed 6 a.m. to 6 p.m. today for semiannual inspection and maintenance work. The viaduct was also closed Saturday, from Spokane Street in the south through the Battery Street Tunnel in the north. Inspection results will be released Friday.
SEATTLE —

The state plans to equip the crumbling Alaskan Way Viaduct with sensors that will close the elevated roadway at the first sign of seismic activity, Gov. Chris Gregoire said Saturday.

The announcement came as Gregoire and Seattle Mayor Greg Nickels met near Qwest Field to sign an agreement to replace the structure with a deep-bore tunnel.

The system will use sensors, signs and gates on entrance ramps to close the structure in an emergency until engineers know whether it is safe to travel on, Gregoire said.

"It is a measure of how seriously we take safety now until we can get the replacement activated," Gregoire said.

The $4.2 billion replacement project is scheduled to open in 2015, but until then, the viaduct, which carries more than 100,000 cars per day, will remain the city's second-busiest north-south arterial after Interstate 5. The structure was damaged in a 2001 earthquake, prompting debate about how to replace it.

In 2007, Seattle voters overwhelmingly rejected a proposal to replace the viaduct with a tunnel and more narrowly rejected a plan to rebuild it as an elevated structure. Transportation officials and politicians deemed the remaining option — tearing it down and shifting traffic onto city streets — impractical, and Nickels pushed ahead with plans for the tunnel.

"There are issues that are worth losing elections over," he said Saturday. "This is one of them."

The state will install the new warning system by the end of next year, Gregoire said, and the federal government will pick up the $5 million to $10 million tab.

The tunnel — the most expensive of options for replacing the viaduct — remains controversial, and about a dozen protesters showed up for Saturday's ceremony, some carrying signs that said "No Big Dig."

"We've had nearly 10 years ... of public meetings, town halls, interest-group briefings, thousands of public comments," Gregoire said. "We have ended the debate, we have made the decision, we have selected the option that will forever change the face of downtown Seattle."

Nickels, who fought hard for the tunnel replacement, said the signing was historic.

"This will make a huge difference in the face of the city. It is one of the most beautiful cities in the world," the mayor said. "In six years we will able to stand on or near this spot and look across and be able to see the waters of Elliott Bay; you'll be reconnecting Pioneer Square with the water, downtown with the water; we'll have a great place for our public to come."

E-mail E-mail article      Print Print view      Share Share

More Local News

NEW - 12:51 AM
Italian lead prosecutor argues Knox motive was hatred

UW provost tapped for Nike's board

Food-bank donations pour in after theft in Rainier Valley

Lynnwood is reinventing itself — again

Man gets 11 1/2 years in I-90 floating-bridge stabbing

More Local News headlines...

Mikasey - if DOT askes the contractor to do something new/different (a change order), you pay the cost. If contractor does something wrong (mess...  Posted on October 25, 2009 at 5:07 AM by 60sCynic. Jump to comment
Won't boring the hole cause seismic activity, set off the sensors, and cause officials to close the viaduct?  Posted on October 24, 2009 at 4:19 PM by beltbelow. Jump to comment
For the $10 million they could hire a 24-7 crew to just stand there and smoke cigars... and flip a switch after the quake... I don;t hate...  Posted on October 25, 2009 at 9:43 AM by FlyingMachine. Jump to comment

advertising


Get home delivery today!

Video

LA Galaxy's David Beckham
Los Angeles Galaxy's David Beckham talks about the upcoming MLS Cup final during after a team practice.

Real Salt Lake's Kyle Beckerman
MLS trophy arrives in Seattle
Chittenden Locks Inspection
Full interview with New Moon actors
Interview with New Moon actors
Artistic Roller Skating
Girls Soccer: Mercer Island vs. Glacier Peak
Smash Putt! Miniature Golf
Opening day at Crystal Mountain

Advertising

AP Video

Entertainment | Top Video | World | Offbeat Video | Sci-Tech

Marketplace

nwautos

2009's most fuel-efficient sedansnew
Choosing a new sedan? Weigh the impact of your choice on your wallet and on the planet.
Post a comment

Open Houses

Find this weekend's open house listings.
Or search by location:

 
Most read
Most commented
Most e-mailed
 
 
Advertising