Advertising

The Seattle Times Company

NWjobs | NWautos | NWhomes | NWsource | Free Classifieds | seattletimes.com

The Seattle Times

Local News


Our network sites seattletimes.com | Advanced

Originally published September 26, 2008 at 12:00 AM | Page modified September 26, 2008 at 3:43 PM

Comments (0)     E-mail article     Print view

"Choppway" plan for Alaskan Way Viaduct unveiled

The eight proposals for replacing the aging Alaskan Way Viaduct were presented to stakeholders Thursday. In all, the state is looking at three surface-boulevard options, two aerial viaducts and three tunnel options.

Seattle Times staff reporter

Imagine a milelong building, filled with office and retail, 90 feet wide and 55 feet tall, stretching from King Street to Victor Steinbrueck Park.

On top of that would be the roadway, and on top of the roadway would be a massive park.

Officially known as Option E among eight proposals for replacing the central waterfront portion of the Alaskan Way Viaduct, it's unofficially called "Chopp in a Box," or "The Choppway."

It's the plan being promoted by House Speaker Frank Chopp, one of the state's most influential politicians. The proposal, which was presented to the viaduct-stakeholders group Thursday, has had the least amount of scrutiny of the eight plans.

Insiders say the city doesn't like it. Not only is it massive, it conceivably could be the most expensive option on the table.

The state Department of Transportation, which is leading the viaduct-replacement talks, said cost figures of the various options won't be available until mid-November.

That's after the elections and, if Republican gubernatorial candidate Dino Rossi wins, he's already said he wants a tunnel to replace the viaduct.

Viaduct project director Ron Paananen won't talk about how the election will affect the viaduct plans. "My boss is now Christine Gregoire," he said. "I think we'll go through the process regardless of the governor's race."

In all, the state is looking at three surface-boulevard options, two aerial viaducts and three tunnel options.

Gone, and officially buried, is a retrofit of the existing viaduct.

Paananen released a copy of a report by California structural engineer Kit Miyamoto, who said any retrofit should not exceed half the cost of replacing the structure, and the state says it could be 90 percent of the replacement cost.

In a media briefing Thursday, Paananen, along with city and county officials, said the state is examining each option based on 27 "performance measures," including cost, transit access, and how much they shade the street.

advertising

Ron Posthuma, assistant director of the King County Department of Transportation, said the eight proposals were weighed for their seismic safety and their design life, and there was little difference. All plans would be built for a 1,000-year earthquake and would have a 75-year life.

Where the differences in the options start to appear is on access to the waterfront.

The Chopp plan and a bored-bypass tunnel rank lower than the rest.

The options also differ in how they affect the downtown "historic properties," such as Pioneer Square, Pike Place Market and warehouses on Western Avenue.

Bob Powers, deputy director of the city's Department of Transportation, said the Chopp plan would separate the historic piers and warehouses and could have significant visual impact along the waterfront.

The options with the least impact would be the surface proposals.

"But none are any deal breaks for any other one," Paananen said. "We have one shot to do this right."

He also explained another option that hasn't received much scrutiny: the lidded trench. This would be a single-level below-ground roadway, about 30 feet deep, built east of the sea wall.

There would be long, narrow openings for ventilation, and a four-lane surface roadway would be built above it along Alaskan Way.

Stakeholders will meet again Nov. 6 to hear the transportation and travel-time differences of each option.

On Nov. 13 they'll get cost estimates, and on Nov. 20 the state plans to reduce the options to two or three.

A final recommendation will be made to Gregoire, Seattle Mayor Greg Nickels and King County Executive Ron Sims by the end of the year.

Susan Gilmore: 206-464-2054 or sgilmore@seattletimes.com

Copyright © 2008 The Seattle Times Company

More Local News headlines...

E-mail article Print view      Share:    Digg     Newsvine

Comments
No comments have been posted to this article. Start the conversation.

Seattle Times Fund For The Needy offers opportunity to give

Tugboat sinks on Seattle's waterfront

Child-support error costs nearly $21,000

Danny Westneat: Bonus for supe with a B minus?

Nicole Brodeur: You have more to spare than you think you do

Advertising

Video

LA Galaxy's David Beckham
Los Angeles Galaxy's David Beckham talks about the upcoming MLS Cup final during after a team practice.

Real Salt Lake's Kyle Beckerman
MLS trophy arrives in Seattle
Chittenden Locks Inspection
Interview with New Moon actors
Full interview with New Moon actors
Artistic Roller Skating
Girls Soccer: Mercer Island vs. Glacier Peak
Smash Putt! Miniature Golf
Opening day at Crystal Mountain

Marketplace

nwautos

2009's most fuel-efficient sedansnew
Choosing a new sedan? Weigh the impact of your choice on your wallet and on the planet.
Post a comment

Open Houses

Find this weekend's open house listings.
Or search by location:

 
Most read
Most commented
Most e-mailed
 
 
Advertising