Originally published June 27, 2008 at 12:00 AM | Page modified June 27, 2008 at 10:34 AM
State proposes 8 Alaskan Way Viaduct alternatives
Plans to replace the Alaskan Way Viaduct continue to inch forward with the state Department of Transportation releasing eight finalists for a new roadway through the central Seattle waterfront.
Seattle Times staff reporter
Plans to replace the Alaskan Way Viaduct continue to inch forward with the state Department of Transportation releasing eight finalists for a new roadway through the central Seattle waterfront.
Gone are plans to retrofit the viaduct or build an Alaskan Way expressway or a bridge over Elliott Bay.
What remains are three surface-boulevard, two aerial-viaduct and three tunnel options. None of the proposals has cost estimates. Those may be done this fall, when the DOT hopes to narrow the choices to two or three. Gov. Christine Gregoire plans to announce the winner in December, which could be a hybrid of the eight proposals.
Taking down and replacing the southern end of the viaduct is scheduled to start in fall 2009.
Costs could eliminate some of the plans. While the state had $2.8 billion available to rebuild the viaduct, it has already spend a large amount of that money on work stabilizing the south part of the viaduct, and DOT officials said only about $1.5 billion remains.
The eight proposals, released Thursday, include:
• A four-lane boulevard along Alaskan Way, complete with stoplights and improvements to Interstate 5. One proposal is to convert the southbound HOV lane between Denny Way and Spokane Street to a HOT (high-occupancy/toll) lane where drivers would pay to use it. This plan also calls for a new transit-only lane northbound from Olive Way to the Highway 520 exit, as well as improved transit.
• A four-lane boulevard along Alaskan Way, but with more transit and improvements to downtown surface streets. It would also try to squeeze one extra lane on I-5 northbound between Cherry Streets and the Highway 520 exit by narrowing the lanes. This option would create about 80 feet of open space along the waterfront.
• A six-lane Alaskan Way-Western Avenue couplet. The two northbound lanes would be on Western and the southbound lanes on Alaskan Way. It would create 110 feet of open space on the waterfront and envisions the same improvements to I-5 as the boulevard proposal.
• A four-lane elevated viaduct, with the lanes side by side, not stacked. This would be similar to the existing viaduct and would retain the views. It would add a northbound I-5 lane between Seneca Street and the Highway 520 exit. And it would convert the HOV lane from Mercer Street to Spokane Street to a HOT lane.
• The most unusual proposal would be a four-lane elevated viaduct that would be covered by a park, with the option of erecting buildings underneath. This viaduct would be about as high as the existing viaduct. The state envisions selling development rights below the viaduct to help with the cost of the structure.
• A four-lane bored bypass tunnel that would start near Qwest Field and go under Western Avenue and Post Alley. The only offramp would be at King Street. This tunnel would be 100 feet deep in places and would go under the Burlington-Northern railroad tracks. It would also go under the Battery Street Tunnel.
![]()
• A cut-and-cover tunnel along the central waterfront. It would be four lanes and emerge onto an elevated roadway at Stewart Street and a surface street by the Pike Place Market. It also calls for the I-5 HOT lane.
• A four-lane lidded trench, with two lanes in each direction. There would be openings in the cover to ventilate the roadway. It also calls for signals on streets north of the Battery Street tunnel.
Susan Gilmore: 206-464-2054 or sgilmore@seattletimes.com
Copyright © 2008 The Seattle Times Company
Illegal workers quietly let go
Metro won't cut bus service after all
Jerry Large: Food-bank theft turns into a gift
Bumper to Bumper: How can the city let bridges go dark?
NEW - 01:26 AM
Tattoos at Mill Creek church pierce skin, soul

Raw Video | Real Salt Lake receives the MLS Cup trophy
Real Salt Lake is handed the 2009 MLS Cup trophy at Qwest Field, November 22, 2009.
nwjobs

Post a comment

Michelle Goodman blogs about work/life balance.
How to tell your office you're gravely ill
Post a comment
nwautos

Choosing a new sedan? Weigh the impact of your choice on your wallet and on the planet.
Post a comment
- 'The Road' takes Viggo Mortensen to Mount St. Helens and Astoria, Ore.
- Tugboat sinks at Seattle waterfront pier
- Child-support error costs nearly $21,000
- Craigslist adoption ad: A plea by young mother-to-be? A scam?
- Chase shrugs off loss of CD investors
- Vikings easily beat the Seahawks
- Denny Triangle gains skyline, but tenants slow to come
- Snow piles up on Cascade slopes
- Woman stabbed by stranger in North Seattle
- Husky Men's Basketball Blog | Saturday's Pac-10 games in review
- Vikings easily beat the Seahawks
134 - Child-support error costs nearly $21,000
129 - Palin excitement builds in Tri-Cities
123 - Tight Senate vote launches health care over hurdle
122 - Cutting through breast-cancer confusion
90 - Prosecutor requests life in prison for Amanda Knox
89 - Historic health care bill clears Senate hurdle
85 - Game thread
70 - New York terror trials will restore faith in rule of law
64 - Chase shrugs off loss of CD investors
54
- 'The Road' takes Viggo Mortensen to Mount St. Helens and Astoria, Ore.
- Child-support error costs nearly $21,000
- It's possible to recover a life lost to hoarding
- Washington state wines make annual best-of list
- Banff: powder, peaks & purity
- Chase shrugs off loss of CD investors
- Protect yourself from baggage loss
- Denny Triangle gains skyline, but tenants slow to come
- Rediscovering Moab, 'the most beautiful place on Earth'
- Northwest Living | On Whidbey, a unified home from multiple recycled parts





